Xerox Nuvera 120 User Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 34
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
Xerox Nuvera™ 100/120 Digital Copier/Printer Customer Expectations Document
- 8 -
Product Space & Power Requirements
Item Xerox Nuvera™ 100/120 Digital
Copier/Printer
Comments
Size – Printer
w/ 1 SFM &
Professional
MFF
131.3” (W) x 30” (D) x 61.6” (H)
3336mm x 736mm x 1565.6mm
Width –
additional
SFM
31.7” ( 805mm)
Optional
Service Space Fixed: 162” (W) x 113” (D)
( 4114.8mm x 2870.0mm)
Moveable: 162” (W) x 92” (D)
( 4114.8mm x 2336.8mm)
- Fixed (stationary) installation: rear of the
system should be at least 30” from the wall.
- Moveable installation: rear of the system
should be at least 10” from the wall and must
be on mobility plates OR hard surface floor
AND 4 modules or less.
Weight 1,753 lb. (795.1 kg)
Additional SFM – 423 lbs. (191.9 kg)
With consumables loaded (except media)
Power and
Agency
Requirements
North America
208 Volts / 30 Amp sole use, 60 Hz
Two phase, 3 wire + PE (L1, L2, N, GND)
UL & cUL compliant
Complies with the FEMP (Federal Energy
Management Program) via the machine
circuit breaker (CB); with the CB switched
off, the system consumes less than 1 watt.
Energy Star (eStar) compliant
Environmental Choice (Canada)
Complies with Section 508 of the ADA
Rehabilitation Act
Power
Requirements
Europe/Japan
200-240 Volts / 25 Amp sole use, 50 Hz
Single phase, 2 wire + PE (L, N, GND)
Energy Star (eStar) compliant
Units are compliant with applicable EU
directives and are CE marked
System Configuration and Installation
Installation Preparation Document
This section should be used in conjunction with the Xerox Nuvera™ 100/120 Digital Copier/Printer
Installation Planning Guide (IPG) and the Xerox Nuvera™ 100/120 Digital Copier/Printer Installation
Preparation Document (IPD), which contain detailed specifications for size, weight, electric, and
environmental conditions. Only the most important requirements are stated here.
Customer Responsibilities
The following must be completed before the system can be delivered and will be assessed in the final site
check:
Item Comments
Identify placement of the system
Ensure the printer can be delivered to the site
Supply the appropriate electrical connections Dedicated power required
Install an exhaust duct to vent hot air to the air
system or the outside if required
Heat Vent Kit is available for stationary system
installations only. The kit lowers the system’s output
from approximately 17,500 BTU/hour to 8,500 BTU/hr.
Verify the strength and slope of the floor
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 33 34

Comments to this Manuals

No comments